We had the soil dug up for the grade beam. This frost wall is super important up here where we have lots of freeze/thaw cycles that can compromise the structure. The bobcat accidentally hit the line for our outdoor electrical panel but, thankfully, it didn't do too much damage and was a quick fix for our good buddy the electrician.
Next up, the foundation forms and re-bar for our concrete. Once this passed inspection, we had the grade beam poured.
Next was our garage pad. We had to remove an existing basement window (local code won't allow this opening once the garage is up) and the sill sat below the finished pad, so it had to go. I asked the contractor to give the pad a brushed finish so the epoxy I plan to apply will adhere better. Because the pad was a few inches higher than our patio, they created a rounded transition from the garage door.
The rest of the garage went up pretty quickly. The trusses were delivered right on time and the guys got to work. Before we knew it, we had walls and a roof! This is the point where I got the most excited, it really is going to make an awesome area for my workshop.
The original soffit and fascia on the rear are still in place, and I think I may just leave it. The ceiling will eventually be drywalled so it won't be seen anyway. The existing garage door will be removed and reinstalled at the entrance to the new addition and we'll remove the existing light fixture.
The electrician comes tomorrow to rough in our lighting and indoor and outdoor outlets...time to shop for an outdoor fixture! The original was just too small for the space and really didn't shed much usable light. Because this rear light will now provide light to the east side of the patio, I want it to be more practical.
Our exterior contractor is super busy and is going to squeeze this job in as soon as he can, he's on deck for next week. Stay tuned for more!